GMP 2 / South Approach Area and Wilkens Avenue

Package B–Multiple Guaranteed Maximum Price (GMP) Proposals

Anticipate 5+ GMP Opportunities

GMPs Anticipated for 2024

  • GMP 1– Early Works–Bids Received
  • GMP 2– Current Opportunity
  • GMP 3– Anticipated Third Quarter of 2024

GMP 2 – Scope

  • Design Package J – Lafayette Bridge Reconstruction
  • Design Package O1 (Partial) – Franklin Ave Bridge Complete and partial scope Mulberry Street Bridge
  • Design Package G2 – Franklin Ave Utility Relocations and Roadway Reconstruction
  • Design Package P (Partial) – Southbound MARC Station Foundations
  • Design Package I – South Approach Structure
  • Design Package 02 (Partial) – Edmondson Temp Pedestrian & Utility Bridge Design and Furnish
  • Design Package N1 (Partial) – Monopoles, Temp OCS ET and C&S Scope required for Interim Track 2&3, Duct Banks
  • Design Package D2 (Partial) – East Side Utilities
  • Design Package H – Charles Interlocking