GMP 2 / South Approach Area and Wilkens Avenue
Package B–Multiple Guaranteed Maximum Price (GMP) Proposals
Anticipate 5+ GMP Opportunities
GMPs Anticipated for 2024
- GMP 1– Early Works–Bids Received
- GMP 2– Current Opportunity
- GMP 3– Anticipated Third Quarter of 2024
GMP 2 – Scope
- Design Package J – Lafayette Bridge Reconstruction
- Design Package O1 (Partial) – Franklin Ave Bridge Complete and partial scope Mulberry Street Bridge
- Design Package G2 – Franklin Ave Utility Relocations and Roadway Reconstruction
- Design Package P (Partial) – Southbound MARC Station Foundations
- Design Package I – South Approach Structure
- Design Package 02 (Partial) – Edmondson Temp Pedestrian & Utility Bridge Design and Furnish
- Design Package N1 (Partial) – Monopoles, Temp OCS ET and C&S Scope required for Interim Track 2&3, Duct Banks
- Design Package D2 (Partial) – East Side Utilities
- Design Package H – Charles Interlocking